Skip Main Navigation
Skip to Content

Engineering Code of Standards and Specifications

 

Updated Engineering Code of Standards and Specifications dated July 26, 2022 are available below. Construction plans that the city engineer has approved in writing prior to the July 26, 2022 effective date shall be considered valid, provided construction of the improvements related thereto is completed within two years of the effective date of a public improvement agreement, development agreement, building permit, or similar document requiring such construction or, in the absence of such, within two years of the approval of the construction plans.  For more information or questions please call the Engineering Division at 720-898-7640.

 
 

2022 Engineering Code of Standards and Specifications

 

Code Sections:

Section 100: Scope of Control of Work

Section 100 Detail Drawings

Section 200: Acceptance Procedures

Section 300: Soils and Earthwork

Section 400: Water Supply Facilities

Section 400 Detail Drawings

Section 500: Sanitary Sewer Facilities

Section 500 Detail Drawings

Section 600: Storm Drainage Facilities

Section 600 Detail Drawings

Section 700: Roadway and Parking Lot Design, Traffic Control Devices and Street Lighting

Section 700 Detail Drawings - Roadway

Section 700 Detail Drawings - Traffic Control

Section 700 Detail Drawings - Traffic Signs

Section 700 Detail Drawings -  Traffic Signals

Section 800: Concrete Mix Design and Construction

Section 800 Detail Drawings

Section 900: Asphalt Mix Design and Construction

Section 900 Detail Drawings

Section 1000: Vegetation, Parks, and Recreation Facilities Construction

Section 1000 Detail Drawings

Section 1100: Control, Measurement and Basis of Payment

 

Approved Products:

Approved Product List

New Approved Product Review Request Form

 

Repealed Code Info:

Repealed 2016 Engineering Code of Standards and Specifications