This project will replace water lines in four areas around the City of Arvada to maintain reliable water service. The work will take place in several locations, across several phases. Locations are as follows: 

  • Phase 1: 84th Way (Castle Gate Apartments) - current (beginning week of 11/21)
    • Between 84th Circle and Webster Drive
  • Phase 2: 74th Place - scheduled to begin in February 
    • Between Kipling Street and 76th Drive
  • Phase 3: Pomona @ Webster & Vance Streets - scheduled for 2023
  • Phase 4: Routt to Robb Streets from W 59th Place to 60th Ave. - scheduled for 2023

Timeline

*All work is weather and supply chain dependent and subject to change. 

Phase 1 (in progress)

  • Approximately 10 weeks 
    • Completion anticipated in early February

Phase 2

  • Approximately 10 weeks
    • Scheduled start date in February
    • Completion anticipated in early April

 

The timeline will be updated as the additional project phases are scheduled. Local residents will be notified.

What to Expect

Phase 1

  • Limited to no parking within construction zones 
    • No parking signs will be in place 24 hours before work begins
  • Single lane closure with one-way traffic may take place throughout the project 
    • Flaggers and signage will be in place to direct traffic
  • Scheduled water outages may occur
    • Impacted residents will be notified with a door hanger from the contractor 
  • Slight, temporary water discoloration may result from water line connection 
    • The water is completely safe. Run your cold water faucet for several minutes until water returns to normal.
  • Working hours will be between 7 a.m.- 7 p.m.
    • Single lane road closures are permitted between 8:30 a.m. - 3:30 p.m.
    • Additional construction traffic and noise may be present during these times
  • Temporary paving will be used until temperatures warm enough to install permanent pavement

Phase 2

  • Limited to no parking within construction zones 
    • No parking signs will be in place 24 hours before work begins
  • W. 74th Place will experience a phased road closure with local traffic access only
    • One section of the road will be fully closed at a time. As the project progresses this closure will move from the east to the west portion of the street.
    • Signage will be in place to direct traffic
  • Scheduled water outages may occur 
    • Impacted residents will be notified with a door hanger from the contractor
  • Slight, temporary water discoloration may result from water line connection 
    • The water is completely safe. Simply run your cold water tap for several minutes until water returns to normal.
  • Working hours will be between 7 a.m.- 7 p.m.
    • ​Additional construction traffic and noise may be present during these times